Are We Building Too Much Natural Gas Pipeline? A comparison of actual US expansion of pipeline to an optimized plan of the interstate network

RESEARCH PAPERS ARE PRELIMINARY MATERIALS CIRCULATED TO STIMULATE DISCUSSION AND CRITICAL COMMENT. THE VIEWS EXPRESSED ARE THOSE OF THE INDIVIDUAL AUTHORS. WHILE RESEARCH PAPERS BENEFIT FROM ACTIVE UHERO DISCUSSION, THEY HAVE NOT UNDERGONE FORMAL ACADEMIC PEER REVIEW.

Interstate natural gas transmission and storage infrastructure is facilitated using regulated, private transactions. Pipeline companies obtain long-term contracts from producers and wholesale purchasers, typically local distribution companies (LDCs). Historically, the Federal Energy Regulatory Commission (FERC) accepted these counterparty contracts as sufficient justification of need. Typically the LDCs are themselves regulated firms, which sometimes possess affiliations with pipeline companies. But with contracted costs largely passed through to retail customers via regulated prices, it is unclear whether contracting parties face sufficient competition or otherwise possess an incentive to find least-cost alternatives. To aid evaluation of past and future investments, we develop a national-level optimization model that can assess the need for new interstate pipeline and storage facilities. The model takes production and demand pathways as fixed and minimizes the infrastructure and operation costs of transport and storage in order to balance supply and demand on each day in each state. Transport of gas can be achieved using pipeline transmission of dry gas, or using truck or ship transport of liquefied natural gas (LNG), and optimal placement of liquefaction and gasification facilities. The model also accounts for international imports and exports of both dry gas and LNG. Three underground drygas storage facilities are considered, as well as LNG storage. We compare the model’s optimized plan with observed outcomes as the sector grew rapidly with hydraulic fracturing. We find that the U.S. has built 38 percent more pipeline and 27 percent more underground storage than necessary, amounting to roughly $179 billion in excess investment. It would have been more economic to expand pipeline far less than observed and instead satisfy critical-peak demands for gas using LNG, plus necessary liquefaction and gasification facilities. Differences between optimized and observed investments vary across the interstate network, while flows between states and into and out of storage bear a close resemblance to observed outcomes.

Leave a Comment

Your email address will not be published. Required fields are marked *

The University of Hawaii Economic Research Organization (UHERO) welcomes online comments to stories that are posted on our website or social media pages. Comments are intended to be a forum for open, respectful, and family-friendly discussion. UHERO reserves the right to remove anything posted on our website or social media pages that is deemed inappropriate. All comments are moderated and will therefore have a delayed post time.
Some guidelines (not an exhaustive list) we use when moderating/approving comments include:

  • Do not bully, intimidate, or harass any user.
  • Do not post content that is hateful, threatening or wildly off-topic; or do anything unlawful, malicious, discriminatory or defamatory.
  • Observe confidentiality laws at all times.
  • Do not post spam or advertisements.
  • Observe fair use, copyright and disclosure laws.
  • Do not use vulgar language or profanity.

UHERO may amend this policy from time to time.